[Federal Register: March 14, 2008 (Volume 73, Number 51)]
[Notices]
[Page 13894-13895]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14mr08-67]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6696-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in Federal Register dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070452, ERP No. D-BLM-J65496-CO, Canyons of the Ancients
National Monument Resource Management Plan, To Address Future
Management Options for Approximately 165.00 Acres of Land, Dolores and
Montezuma Counties, CO.
Summary: EPA does not object to the preferred alternative. Rating:
LO.
EIS No. 20070497, ERP No. D-FAA-K51043-CA, Horizon Air Service to
Mammoth Yosemite Airport Project, Proposed Operations Specifications
Amendment to Provide Scheduled Air Service, Town of Mammoth Lakes, Mono
County, CA.
Summary: EPA does not object to the proposed action. Rating: LO.
EIS No. 20070523, ERP No. D-NRC-E06025-NC, Generic--License Renewal of
Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant,
Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC.
Summary: EPA expressed environmental concerns about water
withdrawal impacts to surface water under exceptional drought
conditions, and requested radiological monitoring of all plant
effluents, and appropriate storage and disposition of radioactive
waste. Rating: EC1.
EIS No. 20080006, ERP No. D-FHW-H40192-NE, Nebraska Highway 35 (N-35)
Corridor, To Improve 66-mile from Norfolk to South Sioux City, Funding,
Madison, Stanton, Wayne, Dixon, and Dakota Counties, NE.
Summary: EPA expressed environmental concern about impacts on two
impaired steams, and the cumulative impacts of induced residential
development, and recommended that noise attenuation measures other than
structural be examined. Rating: EC2.
EIS No. 20080013, ERP No. D-AFS-G65107-NM, Santa Fe National Forest
Project, Settlement Land Transfers: Pueblo de San Ildefonso, Pueblo of
Santa Clara and Los Alamos County, Implementation, Santa Fe National
Forest, Los Alamos, Rio Arriba and Santa Fe Counties, NM.
Summary: EPA does not object to the proposed action. Rating: LO.
EIS No. 20080016, ERP No. D-FHW-L40233-ID, Three Cities River Crossing
Project, New Roadway Crossing of the Boise River at the Juncture of the
Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD),
Ada County, ID.
Summary: EPA expressed environmental concerns about air quality,
including ozone, particulate matter, air toxics, wetlands, aquatic
resources, floodplains, water quality and stormwater management, and
the need to mitigate these impacts. Rating: EC2.
EIS No. 20080018, ERP No. D-FHW-K40267-CA, Phase I--CA 11 Corridor
Location and Route Adoption and Location Identification of the Otay
Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the
POE and Acquisition of Right-Of-Way Permit, San Diego County, CA.
Summary: EPA expressed environmental concerns about air quality
impacts associated with idling trucks and mobile source air toxics and
cumulative impacts to multiple resources, and recommended completing a
full cumulative impact analysis, addressing mobile source air toxics
and committing to anti-idling methods. Rating: EC2.
EIS No. 20070541, ERP No. DS-NOA-L91011-AK, Cook Inlet Beluga Whale
Subsistence Harvest Project, Proposes to Implement a Long-Term Harvest
Plan and Fulfill the Federal Government's Trust Responsibility, Cook
Inlet, AK.
Summary: EPA does not object to the proposed project. Rating: LO.
Final EISs
EIS No. 20070415, ERP No. F-AFS-J65435-UT, Ogden Ranger District Travel
Plan Revision, To Present Additional Analysis for Six Alternatives,
Wasatch-Cache National Forest, Ogden Ranger District, Box Elder, Cache,
Morgan, Weber and Rich Counties, UT.
Summary: EPA continues to have environmental concerns about impacts
from trails needing maintenance and that new trails may not receive
sufficient upkeep.
EIS No. 20070539, ERP No. F-SFW-K39015-CA, PROGRAMMATIC--South Bay Salt
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood
Control Measures and Public Access Features, Don Edward San Francisco
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo
Counties, CA.
Summary: The Final PEIS addressed EPA's previous concerns;
therefore, EPA does not object to the proposed action.
EIS No. 20080009, ERP No. F-AFS-J65465-WY, Lower Valley Energy (LVE)
Natural Gas Pipeline Project, Construction and Operation of a
Pressurized Natural Gas Pipeline, Special-Use-Authorization, Big Piney
and Jackson Ranger Districts, Bridger-Teton National Forest, Sublette
and Teton Counties, WY.
[[Page 13895]]
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080030, ERP No. F-BLM-J65455-MT, Upper Missouri River Breaks
National Monument Resource Management Plan, Implementation, Blaine,
Chouteau, Fergus and Phillips Counties, MT.
Summary: EPA continues to have environmental concerns about impacts
to water quality and aquatic resources from road density, cumulative
effects and the adequacy of resources available for monitoring and
adaptive management and for travel management enforcement.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-5183 Filed 3-13-08; 8:45 am]
BILLING CODE 6560-50-P