[Federal Register: February 15, 2008 (Volume 73, Number 32)]
[Notices]
[Page 8869-8870]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr15fe08-52]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6695-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed 02/04/2008
through 02/08/2008 pursuant to 40 CFR 1506.9.
EIS No. 20080044, Draft EIS, BIA, OR, Cascade Locks Resort and Casino
Project, Application for the Fee-to-Trust Transfer of 25 Acres of Land
within the City of Cascade Locks, Confederated Tribes of the Warn
Springs Reservation of Oregon, Cascade Locks, Hood River County, OR,
Comment Period Ends: 05/15/2008, Contact: Gerald Henrikson 503-231-
6927.
EIS No. 20080045, Draft EIS, BIA, CA, North Fork Rancheria of Mono
Indians Fee-to-Trust and Casino/Hotel Project, Proposed 305-Acres-Fee-
to-Trust Land Acquisition in Unincorporated Madera County, CA, Comment
Period Ends: 03/31/2008, Contact: John Rydzik 916-978-6042.
EIS No. 20080046, Final Supplement, WAP, CA, Sacramento Area Voltage
Support Project, Selected Preferred Alternative B, Proposal to Build a
Double-Circuit 230-kV Transmission Line, Placer, Sacramento and Sutter
Counties, CA, Wait Period Ends: 03/17/2008, Contact: Catherine
Cunningham 720-962-7260.
EIS No. 20080047, Draft EIS, USN, 00, Atlantic Fleet Active Sonar
Training Program, To Provide Mid- and High-Frequency Active Sonar
Technology and the Improved Ext ended Echo Ranging (IEER) System during
Atlantic Fleet Training Exercises, Along the East Coast of United
States (US) and in the Gulf of Mexico, Comment Period Ends: 03/31/2008,
Contact: Karen Foskey 703-602-2859.
EIS No. 20080048, Draft EIS, BLM/DEQ, MT, Montana Tunnels Mine Project,
Proposed M-Pit Mine Expansion to Existing Mine Pit to Access and Mine
Additional Ore Resources, Jefferson County, MT, Comment Period Ends:
03/31/2008, Contact: David Williams 406-533-7655. Bureau Land
Management and the Montana Department of Environmental (DEQ) are Co-
Lead Agencies for the above project.
This document is available on the Internet at: http://www.deq.mt.gov
.
EIS No. 20080049, Draft EIS, FRC, 00, Midcontinent Express Pipeline
Project, (Docket Nos. CP08-6-000), Construction and Operation to
Facilitate the Transport of 1,500, 000 dekatherms per day of Natural
Gas from Production Fields in eastern TX, OK, and AR to Market Hub,
located in various counties and parishes in OK, TX, LA, MS and AL ,
Comment Period Ends: 03/31/2008, Contact: Andy Black 1-866-208-3372.
EIS No. 20080050, Draft EIS, FRA, NJ, Portal Bridge Capacity
Enhancement Project, To Replace the nearly 100-Year-Old Portal Bridge
and Eliminate Capacity Constraints on the Northeast Corridor between
Swift Interlocking and Psychics Transfer Station, Hackensack River,
Hudson County, NJ, Comment Period Ends: 03/31/2008, Contact: David
Valenstein 202-493-6368.
EIS No. 20080051, Final EIS, AFS, MT, Beaverhead-Deerlodge National
Forest Draft Revised Land and Resource Management Plan, Implementation,
Beaverhead, Butte-Silver Bow, Deerlodge, Granite, Jefferson, Madison
Counties, MT, Wait Period Ends: 03/17/2008, Contact: Leaf Magnuson 406-
683-3950.
EIS No. 20080052, Final EIS, FTA, FL, Tier 1 Programmatic--Jacksonville
Rapid Transit System (RTS), Improvement to Transportation in Four
Primary Transit Corridors Radiating from Downtown Jacksonville, Duval
County, FL, Wait Period Ends: 03/17/2008, Contact: Tajsha LaShore 404-
865-5606.
EIS No. 20080053, Draft EIS, FHW, DC, South Capitol Street Project,
Replacement of the Fredrick Douglass Memorial Bridge, from Firth
Sterling Avenue, SE. to Independence Avenue and the Suitland Parkway
from Martin Luther King, Jr. Avenue, SE. to South Capitol Street,
Washington, District of Columbia, Comment Period Ends: 03/31/2008,
Contact: Michael Hicks 202-219-3513.
EIS No. 20080054, Draft EIS, DOE/DEQ, MT, MATL 230-kV Transmission Line
Project, To Construct, Operate, Maintain, and Connect a 230-kV Electric
Transmission Line, Issuance of Presidential Permit for Right-to-Way
Grant, Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties,
MT, Comment Period Ends: 03/31/2008, Contact: Ellen Russell 202-586-
9624. Department of Energy and the Montana Department of Environmental
Quality (DEQ) are Co-Lead Agencies for the above project.
EIS No. 20080055, Final EIS, AFS, 00, National Forest System Land
Management Planning, Implementation, Proposed Land Management Planning
Rule at 36 CFR Part 219 to Finish Rulemaking, Wait Period Ends: 03/17/
2008, Contact: Dave Sire 202-205-1006.
EIS No. 20080056, Final EIS, AFS, AK, Tongass Land and Resource
Management Plan, Plan Amendment, Implementation, Tongass National
Forest, AK, Wait Period Ends: 03/17/2008, Contact: Lee Kramer 907-789-
6246.
Amended Notices
EIS No. 20080025, Draft EIS, FTA, TX, Northwest Corridor Light Rail
Transit Line (LRT) to Irving/Dallas/Fort Worth International Airport,
Construction, Dallas County, TX, Comment Period Ends: 03/11/2008,
Contact: A.J. Ossi 202-366-1613.
[[Page 8870]]
Revision of FR Notice Published on 01/25/2008: Correction to Lead
Agency from FAA to FTA.
EIS No. 20080040, Draft EIS, IBR, CA, Folsam Lake State Recreation Area
& Folsam Powerhouse State Historic Park, General Plan/Resource
Management Plan, Implementation, Placer County, CA, Comment Period
Ends: 03/24/2008, Contact: Laura Cabollero 916-989-7172. Revision to FR
Notice Published 02/08/2008: Correction to the County and State.
Dated: February 12, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-2951 Filed 2-14-08; 8:45 am]
BILLING CODE 6560-50-P