[Federal Register: November 23, 2007 (Volume 72, Number 225)]
[Notices]
[Page 65731-65732]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr23no07-67]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6693-3]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 6, 2007 (72 FR
17156).
Draft EISs
EIS No. 20070377, ERP No. D-COE-E39070-TN, Center Hill Dam and Lake
Project, Changes to Operational Guide Curves Pool Elevations, Chancey
Fork River and Cumberland River, Dekalb County, TN.
Summary: EPA expressed environmental concerns about impacts to
water quantity and impacts related to dam releases, and also requested
additional dam failure risk assessment information.
Rating EC2.
EIS No. 20070396, ERP No. D-AFS-L65542-ID, Cherry Dinner Project,
Management of Vegetation, Hazardous Fuels, and Access Plus Watershed
Improvements, Amendment to the Forest Plan, Palouse Ranger District,
Clearwater National Forest, Latah County, ID.
Summary: EPA expressed environmental concerns about water quality
impacts within streams and creeks that are already on the state of
Idaho's current 303(d) list due to temperature and sediment load
exceedances.
[[Page 65732]]
Rating EC2.
EIS No. 20070445, ERP No. D-USN-E11063-00, Shock Trail of the MESA
VERDE (LPD 19), San Antonio (LPD 17) Class Ship designated as the Shock
Ship for Proposed Shock Trail, Possible Offshore Locations are Naval
Station Norfolk, VA; Naval Station Mayport, FL; and Naval Air Station
Pensacola, FL.
Summary: EPA expressed environmental concerns about impacts to
avian and marine species.
Rating EC1.
EIS No. 20070364, ERP No. DS-COE-E01013-FL, Rock Mining in the Lake
Belt Region Plan, Continuance of Limestone Mining Construction, section
404 Permit, Miami-Dade County, FL.
Summary: EPA expressed environmental concerns about water quality,
wetland and mining-related seepage impacts, and requested additional
mitigation and monitoring measures.
Rating EC2.
Dated: November 19, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E7-22851 Filed 11-21-07; 8:45 am]
BILLING CODE 6560-50-P