[Federal Register: November 16, 2007 (Volume 72, Number 221)]
[Notices]
[Page 64618-64619]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr16no07-66]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6692-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements.
Filed 11/05/2007 through 11/09/2007.
Pursuant to 40 CFR 1506.9.
EIS No. 20070480, Draft EIS, AFS, UT, Pockets Resource Management
Project, Proposes to Salvage Dead and Dying Spruce/Fir, Regenerate
Aspen, and Manage Travel, Escalate Ranger District, Dixie National
Forest, Garfield County, UT, Comment Period Ends: 12/31/2007, Contact:
Georgina Lampman 435-826-5401.
EIS No. 20070481, Draft Supplement, COE, NC, PCS Phosphate Mine
Continuation, New Information on Additional Alternative ``L'' and
``M'', Proposes to Expand its Existing Open Pit Phosphate Mining
Operation into a 3,412 Acre Tract, Pamlico River and South Creek, near
Aurora, Beaufort County, NC, Comment Period Ends: 12/31/2007, Contact:
Tom Walker 828-271-7980 Ext 222.
EIS No. 20070482, Draft EIS, FHW, UT, UT-108 Transportation Improvement
Project, To Improve Local and Regional Mobility from UT-108 between UT-
127 (Antelope Drive) to UT-126 (1900 West) Located in Syracuse, West
Point and Clinton in Dave County, and Roy and West Haven in Weber
County, UT.P>Comment Period Ends: 01/05/2008, Contact: Douglas Atkin
801-963-0182.
EIS No. 20070483, Draft Supplement, FHW, TN, Kirby Parkway Project,
Construction from Macon Road to Walnut Grove Road, U.S. Army COE
Section 401 and 404 Permits, Shelby County, TN, Comment Period Ends:
12/31/2007, Contact:
Laurie S. Leffler 615-781-5770.
[[Page 64619]]
EIS No. 20070484, Draft EIS, FHW, 00, Interstate-94, I-43, I-894, and
WI-119 (Airport Spur) I-94/USH 41 Interchange to Howard Avenue, To
Address Freeway System's Deteriorated Conditions, Funding and U.S. Army
COE Section 404 Permit, Kenosha, Racine and Milwaukee Counties, WI and
Lake County, IL, Comment Period Ends: 12/31/2007, Contact: David Scott
608-829-7522.
EIS No. 20070485, Final EIS, AFS, CA, Kirkwood Mountain Resort,
Proposed 2003 Mountain Master Development Plan, Implementation,
Eldorado National Forest, Amador, Alpine and EL Dorado Counties, CA,
Wait Period Ends: 12/17/2007, Contact: Sue Rodman 530-622-5061.
EIS No. 20070486, Final Supplement, COE, 00, Yazoo Basin Reformulation
Study, Supplement No.1 to the 1982 Yazoo Area Pump Project, Flood
Control, Mississippi River and Tributaries, Yazoo Basin, MS and LA,
Wait Period Ends: 01/22/2008, Contact: Marvin Cannon 601-631-5437.
EIS No. 20070487, Second Final Supplement, COE, FL, Lake Okeechobee
Regulation Schedule Study, New Updated Information, Evaluation of Three
New Alternatives on Operational Changes to the Current Water Control
Plan, Lake Okeechobee and the Everglades Agricultural Area, Lake
Okeechobee, Glades, Okeechobee Hendry, Palm Beach and Martin Counties,
FL, Wait Period Ends: 12/17/2007, Contact: Yvonne L. Haberer 904-232-
1701.
EIS No. 20070488, Draft EIS, DOE, 00, PROGRAMMATIC--Designation of
Energy Corridors in 11 Western States, Preferred Location of Future
Oil, Gas, and Hydrogen Pipelines and Electricity Transmission and
Distribution Facilities on Federal Land, AZ, CA, CO, ID, MT, NV, NM,
UT, WA and WY, Comment Period Ends: 02/14/2008, Contact: LaVerne Kyriss
202-586-1056.
EIS No. 20070489, Final EIS, DOE, 00, FutureGen Project, Planning,
Design, Construction and Operation of a Coal Fueled Electric Power and
Hydrogen Gas Production Plant, Four Alternative Sites: Mattoon, IL,
Tuscola, IL, Jewett, TX, and Odessa, TX, Wait Period Ends: 12/17/2007,
Contact: Mark McKoy 304-285-4426.
EIS No. 20070490, Final Supplement, COE, CO, Rueter-Hess Reservoir
Expansion Project , Enlarges Reservoir to Provide Storage of Denver
Basin Groundwater for Meeting Peak Municipal Water Supply, U.S. Army
COE Section 404 Permit, Town of Parker, Douglas County, CO, Wait Period
Ends: 12/17/2007, Contact: Rodney J. Schwartz 402-221-4143.
EIS No. 20070491, Final EIS, AFS, CO, Bull Mountain Natural Gas
Pipeline, Construct, Operate and Maintain Natural Gas Pipeline,
Issuance of Right-of-Way Grant and Temporary Use Area Permits,
Gunnison, Delta, Mesa, Garfield Counties, CO, Wait Period Ends: 12/17/
2007, Contact: Niccole Mortensen 970-874-6616.
EIS No. 20070492, Draft EIS, DHS, 00, Rio Grande Valley Sector Project,
Construction, Maintenance, and Operation of Tactical Infrastructure,
U.S./Mexico International Border in Southernmost Portions of Starr,
Hidalgo and Cameron Counties, TX, Comment Period Ends: 12/31/2007,
Contact: Gregory Giddens 202-344-2450.
EIS No. 20070493, Final EIS, AFS, ID, Sun Valley Resort (Bald Mountain)
2005 Master Plan--Phase I Project, Implementation, Special-Use-Permits,
Sawtooth National Forest, Blaine County, ID, Wait Period Ends: 12/17/
2007, Contact: Carol Brown 208-727-5000.
EIS No. 20070494, Legislative Final EIS, COE, LA, Mississippi River--
Gulf Outlet (MRGO) Deep-Draft Navigation De-Authorization Study,
Implementation, St. Bernard Parish, LA, Wait Period Ends: 12/17/2007,
Contact: Sean Mickal 504-862-2319.
Amended Notices
EIS No. 20070373, Draft EIS, RUS, WY, WITHDRAWN--Dry Fork Station and
Hughes Transmission Line, Construct Electric Generating Facilities,
Campbell and Sheridan Counties, WY, Comment Period Ends: 10/15/2007,
Contact: Richard Fristik 202-720-5093. Revision of FR Published 08/31/
2007: Officially Withdrawn by the Preparing Agency.
EIS No. 20070385, Draft EIS, FHW, 00, Peace Bridge Expansion Project,
Capacity Improvements to the Peace Bridge, Plazas and Connecting
Roadways, U.S. Coast Guard Bridge Permit, U.S. Army COE Section 10 and
404 Permits. City of Buffalo, Erie County, NY and Town of Fort Erie,
Ontario, Canada, Comment Period Ends: 11/30/2007, Contact: Amy Jackson-
Grove 518-431-4131. Revision of FR Notice Published 09/14/2007:
Extending Comment Period from 11/13/2007 to 11/30/2007.
EIS No. 20070469, Draft EIS, NOA, 00, Snapper Grouper Amendment 15B,
Fishery Management Plan, To Analyze the Effects of Updating Management
Reference Points for Golden Tilefish (Lopholatilus chamaeleonticeps);
Define Allocations for Snowy Grouper (Epinephelus niveatus) and Red
Porgy (Pagrus pagrus), NC, SC, FL and GA, Comment Period Ends: 01/11/
2008, Contact: Dr. Roy E. Crabtree 727-824-5301. Revision to FR Notice
Published: 11/09/2007: Correction to Title.
Dated: November 13, 2007.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 07-5713 Filed 11-15-07; 8:45 am]
BILLING CODE 6560-50-P