[Federal Register: October 4, 2006 (Volume 71, Number 192)]
[Rules and Regulations]
[Page 58540-58541]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr04oc06-20]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Defense Acquisition Regulations System
48 CFR Part 236
RIN 0750-AF41
Defense Federal Acquisition Regulation Supplement; Congressional
Notification of Architect-Engineer Services/Military Family Housing
Contracts (DFARS Case 2006-D015)
AGENCY: Defense Acquisition Regulations System, Department of Defense
(DoD).
ACTION: Interim rule with request for comments.
-----------------------------------------------------------------------
SUMMARY: DoD has issued an interim rule amending the Defense Federal
Acquisition Regulation Supplement (DFARS) to implement Section
1031(a)(37) of the National Defense Authorization Act for Fiscal Year
2004. Section 1031(a)(37) amended the requirements for submission of a
notification to Congress before the award of a contract for
architectural and engineering services or construction design in
connection with military construction, military family housing, or
restoration or replacement of damaged or destroyed facilities.
DATES: Effective date: October 4, 2006.
Comment date: Comments on the interim rule should be submitted in
writing to the address shown below on or before December 4, 2006, to be
considered in the formation of the final rule.
ADDRESSES: You may submit comments, identified by DFARS Case 2006-D015,
using any of the following methods:
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the instructions for submitting comments.
E-mail: dfars@osd.mil. Include DFARS Case 2006-D015 in the
subject line of the message.
Fax: (703) 602-0350.
Mail: Defense Acquisition Regulations System, Attn: Ms.
Debra Overstreet, OUSD(AT&L)DPAP(DARS), IMD 3C132, 3062 Defense
Pentagon, Washington, DC 20301-3062.
Hand Delivery/Courier: Defense Acquisition Regulations
System, Crystal Square 4, Suite 200A, 241 18th Street, Arlington, VA
22202-3402.
Comments received generally will be posted without change to http://www.regulations.gov
, including any personal information provided.
FOR FURTHER INFORMATION CONTACT: Ms. Debra Overstreet, (703) 602-0310.
SUPPLEMENTARY INFORMATION:
A. Background
This interim rule revises DFARS 236.601 to implement Section
1031(a)(37) of the National Defense Authorization Act for Fiscal Year
2004 (Public Law 108-136). Section 1031(a)(37) amended the requirements
at 10 U.S.C. 2807, for submission of a notification to Congress before
the award of a contract for architectural and engineering services or
construction design in connection with military construction, military
family housing, or restoration or replacement of damaged or destroyed
facilities. The amendments increased the contract dollar threshold for
submission from $500,000 to $1,000,000; and reduced the time period for
submission, from 21 to 14 days before obligation of funds, when the
notification is provided in electronic medium.
This rule was not subject to Office of Management and Budget review
under Executive Order 12866, dated September 30, 1993.
B. Regulatory Flexibility Act
DoD does not expect this rule to have a significant economic impact
on a substantial number of small entities within the meaning of the
Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because the rule
relates to reporting requirements that are internal to the Government.
Therefore, DoD has not performed an initial regulatory flexibility
analysis. DoD invites comments from small businesses and other
interested parties. DoD also will consider comments from small entities
concerning the affected DFARS subpart in accordance with 5 U.S.C. 610.
Such comments should be submitted
[[Page 58541]]
separately and should cite DFARS Case 2006-D015.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply, because the rule does
not impose any information collection requirements that require the
approval of the Office of Management and Budget under 44 U.S.C. 3501,
et seq.
D. Determination to Issue an Interim Rule
A determination has been made under the authority of the Secretary
of Defense that urgent and compelling reasons exist to publish an
interim rule prior to affording the public an opportunity to comment.
This interim rule implements Section 1031(a)(37) of the National
Defense Authorization Act for Fiscal Year 2004 (Public Law 108-136).
Section 1031(a)(37) amended the statutory requirements for submission
of a notification to Congress before the award of a contract for
architectural and engineering services or construction design in
connection with military construction, military family housing, or
restoration or replacement of damaged or destroyed facilities. Comments
received in response to this interim rule will be considered in the
formation of the final rule.
List of Subjects in 48 CFR Part 236
Government procurement.
Michele P. Peterson,
Editor, Defense Acquisition Regulations System.
0
Therefore, 48 CFR Part 236 is amended as follows:
PART 236--CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS
0
1. The authority citation for 48 CFR Part 236 continues to read as
follows:
Authority: 41 U.S.C. 421 and 48 CFR Chapter 1.
0
2. Section 236.601 is revised to read as follows:
Sec. 236.601 Policy
(1) Written notification to the congressional defense committees is
required if the total estimated contract price for architect-engineer
services or construction design, in connection with military
construction, military family housing, or restoration or replacement of
damaged or destroyed facilities, exceeds $1,000,000. In accordance with
10 U.S.C. 480, unclassified notifications must be provided by
electronic medium.
(i) For military construction or military family housing (10 U.S.C.
2807(b)), the notification--
(A) Must include the scope of the project and the estimated
contract price; and
(B)(1) If provided by electronic medium, must be provided at least
14 days before the initial obligation of funds; or
(2) If provided by other than electronic medium, must be received
by the congressional defense committees at least 21 days before the
initial obligation of funds.
(ii) For restoration or replacement of damaged or destroyed
facilities (10 U.S.C. 2854(b)), the notification--
(A) Must include the justification for the project, the estimated
contract price, and the source of the funds for the project; and
(B)(1) If provided by electronic medium, must be provided at least
7 days before the initial obligation of funds; or
(2) If provided by other than electronic medium, must be received
by the congressional defense committees at least 21 days before the
initial obligation of funds.
(2) During the applicable notice period, synopsis of the proposed
contract action and administrative actions leading to the award may be
started.
[FR Doc. E6-16419 Filed 10-3-06; 8:45 am]
BILLING CODE 5001-08-P